About us :
In the initial design of the 12th phase of South Pars gas field development, it was predicted that 2600 million standard cubic feet per day of crude gas would be produced. According to that, the products of this plan include light and sweet gas for national pipelines of National Gas Company and liquid natural gas. In addition to the above two products, it was expected to obtain other pro ...
More -
About us :
In the initial design of the 12th phase of South Pars gas field development, it was predicted that 2600 million standard cubic feet per day of crude gas would be produced. According to that, the products of this plan include light and sweet gas for national pipelines of National Gas Company and liquid natural gas. In addition to the above two products, it was expected to obtain other products such as ethane, propane, butane and pentane and heavier (natural gasoline) from the gas delivered to National Gas Company. All the sweetened gas should be processed to supply to the pipeline network of National Gas Company. In this way, the extraction of ethane, propane and butane from all the incoming raw gas is done. In this way, the goal of the implementation of the huge recovery project, the extraction of phase 12 gas liquids, the production of gas products, ethane, propane, butane and natural gasoline from all the gas from all the sweet and rich gas It is an output from the confectionery unit.
Design capacityIn the 12th phase of South Pars gas field development plan, it is expected that a total of 3000 million standard cubic feet per day, equivalent to 85 million cubic meters per day, of raw gas will be produced from the reservoir. After the separation of gas condensates and acid gases, it is expected that the volume of gas entering the gas liquids recycling unit will be about 2820 million standard cubic feet per day (equivalent to 80 million cubic meters per day) of sweet gas. It is assumed that the gas required for the production of ancillary services of the upstream facilities of the gas liquids recycling unit (separation of gas condensate and sweetening) is taken from the output gas of that unit and 2880 mfm (3.4 million cubic meters per hour) net The received sweet gas is a gas liquid recycling unit.
Manufactured productsLight gas
Close
Ethan
natural gasoline (C5+)
Roundabouts